A generator interlock kit is a metal or plastic device that physically prevents your main breaker and generator breaker from being on at the same time, keeping utility workers safe and your home protected. It is legal in Illinois, including Chicago and the surrounding suburbs, when installed by a licensed electrician and approved by your local building department. This article covers how interlock kits work, how they compare to transfer switches, what installation costs in the Chicago area, and what Illinois code requires.
Understand How a Generator Interlock Kit Works
An interlock kit slides or bolts onto the face of your electrical panel. It creates a mechanical barrier between two specific breakers, your main utility breaker and the breaker dedicated to your generator circuit.
When you flip the generator breaker on, the interlock physically blocks the main breaker from turning on. When utility power is restored, you flip the sequence in reverse. It is a simple, physical lock, not electronics.
This matters because backfeed is a real danger. If utility power and generator power are both live at the same time, electricity can travel back through your meter and onto the power lines outside, creating a deadly hazard for lineworkers.
Interlock kits are panel-specific. A kit made for a Square D QO200 panel will not fit a Siemens or Eaton panel. Your electrician must match the kit to your exact panel model and series before ordering parts.
Confirm the Legality of Interlock Kits in Illinois
Yes, generator interlock kits are legal in Illinois. The state follows the National Electrical Code, and the NEC permits interlock kits as an alternative to a full transfer switch under Article 702 for optional standby systems.
However, legal does not mean permit-free. In Chicago and Cook County, you typically need a permit for this type of electrical work. Many suburban municipalities within 40 miles of Chicago, including Naperville, Joliet, Aurora, and Elgin, also require permits and inspections.
The permit process protects you. If you skip it and later file a homeowner’s insurance claim after storm damage or a generator fire, your insurer may deny the claim because unpermitted electrical work was involved.
Jimco Electric handles permit pulling for clients throughout the Chicago metro area, so you do not have to figure out which forms your village or city requires. That step is built into our installation process.
Compare Interlock Kits vs. Transfer Switches
Homeowners often ask whether they should get an interlock kit or a manual transfer switch. Both are legal, but they work differently and cost differently. Here is a clear comparison.
| Feature | Interlock Kit | Manual Transfer Switch | Automatic Transfer Switch |
|---|---|---|---|
| Average installed cost | $300 to $600 | $500 to $900 | $1,500 to $3,000+ |
| Switches automatically? | No | No | Yes |
| Powers whole panel? | Yes (up to generator capacity) | Selected circuits only | Depends on model |
| Permit required in IL? | Usually yes | Usually yes | Yes |
| Best for | Budget-conscious homeowners | Specific circuit needs | Whole-home standby systems |
Interlock kits are the most affordable legal option and work well for portable generators. If you have a standby generator already connected to your home, an automatic transfer switch is the right choice instead.
Review Generator Interlock Kit Installation Costs in the Chicago Area
Costs vary based on your panel brand, panel age, and local permit fees. Below is a realistic breakdown for Chicago-area homeowners in 2024 and 2025.
| Cost Item | Typical Range (Chicago Metro) |
|---|---|
| Interlock kit hardware | $30 to $100 |
| Electrician labor (2 to 4 hours) | $150 to $400 |
| New 30A or 50A generator breaker | $20 to $60 |
| Inlet box and outdoor receptacle | $80 to $200 |
| Permit fees (city or village) | $50 to $200 |
| Total estimated installed cost | $330 to $960 |
Chicago city proper sometimes has higher permit fees than suburban municipalities. Suburbs like Schaumburg, Bolingbrook, or Orland Park tend to have faster inspection turnaround times, which can affect your overall project timeline.
These numbers assume your existing panel is in good shape. If your panel is over 30 years old or has known issues, your electrician may recommend addressing those first.
Follow These Steps to Get an Interlock Kit Installed Correctly
If you are ready to move forward, here is the general process a licensed electrician follows for a compliant interlock kit installation in Illinois.
- Panel assessment: The electrician inspects your panel to confirm it is compatible and in safe condition.
- Kit selection: The correct interlock kit is ordered for your specific panel brand, model, and bus bar layout.
- Permit application: Your contractor submits the permit to your local building department before work begins.
- Inlet box installation: A generator inlet box is mounted on the exterior of your home, giving you a safe place to plug in your generator’s power cord.
- Breaker and wiring: A dedicated double-pole breaker is added to the panel and wired to the inlet box.
- Interlock installation: The kit is mounted to the panel door or face plate according to the manufacturer’s instructions.
- Inspection: A city or village inspector visits to approve the work before the project is closed out.
Do not skip the inspection step. An uninspected installation can create insurance problems and may need to be redone if you sell your home and a buyer’s inspector flags it.
Know the Local Considerations for Chicago and Surrounding Suburbs
Chicago’s winters are a primary reason many homeowners in the area want generator backup. Ice storms and high-wind events regularly knock out power for hours or even days in neighborhoods across Cook, DuPage, Will, Kane, and Lake counties.
A few things are specific to this region that you should know before starting your project.
- Chicago city permits: The City of Chicago requires an electrical permit for interlock kit installations. Work performed without one can result in fines and forced removal.
- ComEd coordination: You do not need ComEd to approve the installation, but your inlet box must be placed so that the generator is at least 5 feet from windows, doors, and vents per local codes.
- Older homes in Chicago: Many bungalows and two-flats in Chicago have outdated panels, including Federal Pacific or Zinsco panels, that are not suitable for interlock kits and may need a full panel replacement first.
- Suburban HOAs: Some HOAs in suburbs like Naperville or Downers Grove have rules about where a generator can be placed or operated. Check with your HOA before scheduling installation.
- Carbon monoxide rules: Illinois law requires CO detectors in homes. Running a portable generator must always happen outdoors, never in a garage or basement, no matter how you connect it.
Jimco Electric has worked with homeowners across the Chicago metro area on interlock kit projects. We know which local departments move quickly and which require more lead time for inspections.
FAQs on Generator Interlock Kits in Illinois
Can I install a generator interlock kit myself in Illinois?
Technically, Illinois does not prohibit homeowner DIY electrical work on your own home in all jurisdictions. However, Chicago and most suburbs require a licensed electrician to pull permits for panel work. Attempting this without a permit and without proper skills is risky, and an improper installation can cause fires or electrocution. Hiring a licensed electrician is strongly recommended.
What size generator do I need to use with an interlock kit?
The generator size depends on what you want to power during an outage. A 5,000 to 7,500-watt portable generator can handle essential loads like a refrigerator, lights, a sump pump, and a window AC unit. Your electrician can help you calculate your load requirements before choosing a generator or sizing the inlet breaker.
Does an interlock kit work with any electrical panel?
No, interlock kits are panel-specific. Manufacturers like Reliance Controls, GenInterlock, and EZ Generator Switch all make kits designed for specific panel brands and series numbers, including Square D, Siemens, Eaton, and Leviton. Your electrician needs to identify your exact panel model before ordering the correct kit.
How long does the installation take?
The physical installation typically takes two to four hours for an experienced electrician. Permit approval timelines vary by municipality. In many Chicago suburbs, permits can be approved within a few days. In Chicago proper, the process may take one to two weeks, depending on current workload at the Department of Buildings.
Is an interlock kit safe compared to a transfer switch?
Yes, when installed correctly, an interlock kit is a safe and code-compliant method of connecting a portable generator. The mechanical design physically prevents backfeed by making it impossible to have both the main breaker and the generator breaker on simultaneously. Safety depends on proper installation and following correct startup procedures each time you use the generator.
What happens if I do not get a permit for my interlock kit in Illinois?
Working without a permit in Illinois can result in fines, a stop-work order, or being required to remove and redo the work. More importantly, unpermitted electrical installations can void your homeowner’s insurance coverage for any related claims. If you sell your home, a home inspector will likely flag it, which can delay or derail your sale.
Wrap Up and Next Steps
A generator interlock kit is a legal, affordable, and code-compliant way to connect a portable generator to your home’s electrical panel in Illinois. When installed by a licensed electrician with the proper permits, it gives you reliable backup power without the higher cost of a full transfer switch.
If you are in Chicago or within 40 miles of the city and want to get this done right, contact Jimco Electric. Our team handles everything from panel assessment and permit pulling to final inspection. Call us at 708-304-8687 to schedule your installation or get a free quote.